Stage electric wire rope hoist  lifting weights and running from the car when improper methods, swing accident will occur. The following summarizes the stage upside down for you to hoist lifting and operational aspects of common sense.
Stage electric hoist lifting hanging objects, when the chain tension should stop, stage hoist hook jitter at the direction of the hook again, identify, and lifting workers should check whether hanging objects hanging in prison, stage electric hoist lifting, do not excessive force when hanging objects from the obstacle to accelerate until after lifting speed,hoist equipment stage electric hoist lifting of hanging objects is not easy too high, generally over a secure channel up to 0.5m for the good things.

1) Chain hoist stage should be checked before use hooks, chains, etc. is good, transmission and brakes are good. Hook, chain, inverted cards are deformed, and the chain diameter wear volume of 15%, is strictly prohibited.
2) Two or more chain-stage hoist lifting the same weights, the weight should be less than the weight of each stage of the chain-type electric hoist lifting capacity allowed.
3) Chain hoist lifting chain arena not playing Twist and may not be split into single strand use.
4) Chain hoist brake pads stage to prevent contamination of grease.
5) Chain hoist not to overload the stage, lifting capacity 5t allow a person below the zipper, lifting capacity 5t above allows two zippers, not free to increase the number of tugs, operation,lift hoist shall not stand Chain hoist just below the stage.
6) lifting heavy objects stay in the air for a long time, put your hand zip tied on chains and heavy additional insured on the rope.
7) Chain hoist stage occurred in the use of such cards chain case, the weight should be a good pad before overhaul.
Stage electric hoist the runtime not intermittent, long-distance running, it is best to run a long power transmission as well. Stage electric hoist hanging objects should be to ensure the smooth running, stage hoist hanging objects swing or if jitter should be run in the operation side edge stability hook, not let it shake or swing.