lift hoist factory, the general rule of 60 hours of run-in period (some called a walk-in period), which is based on the early use of the technical characteristics of the lift hoist and requirements. Run-in period is to ensure the normal operation of the lift hoist and reduce the failure rate and prolong its service life the important part.
1, because the lift hoist is a special vehicle, operating personnel should receive training, guidance, the machine structure, properties have a full understanding and get some experience in the operation and maintenance before operating the machine. Manufacturers to provide product maintenance manual, is the operator to operate the equipment necessary information before operating the machine, be sure to read the maintenance manual, according to the instructions of the requirements to operate and maintenance.
2, note that the workload run-in period, the workload of the general run-in period should not exceed 80% of the rated working load, and to arrange for appropriate workload, long continuous operation to prevent the machine overheating caused by the occurrence.
3, note that each instrument instruction frequently observed, abnormal, should be excluded stop in time, the cause is not found, the fault is not excluded, should cease operations.
4, pay attention to regular checks of lubricating oil, hydraulic oil, coolant, brake fluid and fuel oil (water) bit and the quality and attention to check the tightness of the machine. Inspection found that too much water is missing, you should analyze the reasons. Meanwhile, the lubrication points should be strengthened lubrication is recommended run-in period, the class must be on the lubrication point greasing (except for special requirements).
5, keep the machine clean, adjust, tighten loose parts, to prevent wear and tear loose and aggravate or cause component parts missing.
6, the end of the run-in period, the forced response machine maintenance, inspection and adjustment of work to do, while paying attention to fluid replacement.
In short, use and maintenance of manual hoistin the run-in period, the requirements can be summarized as follows: to enhance the training, to reduce the load, pay attention to check, and strengthen lubrication. As long as the emphasis on the implementation of the lift hoist as required run-in period of care and maintenance, will reduce the incidence of early failure and prolong life, improve operational efficiency, enabling the machine to bring you more revenue.
没有评论:
发表评论