Rope transportation, maintenance settlement volume

1, the  rope  transport: loading rope sling plate can penetrate the rope reel shaft hole or shaft hole with a pipe after the social order, and then tie clip set in the pipe ends, prohibited direct rolling down from a height, must use the transition springboard slowly sliding or lifting with a crane, the ground handling time, and if used to pry carry, do not pry on the rope directly to the surface, so as to avoid crushing haul rope surface coverage required tarpaulins to prevent rainwater infiltration caused by corrosion of use.
2,  Wire rope  maintenance: new ropes acceptance of storage, it should be placed in a dry room, avoid direct sunlight and heat baking; such must be placed outdoors, should be placed on higher ground on the ground, covered with tarpaulins. Placed on the ground generally elevate 300mm or more.
3, rope unwinding: If you need to use when re-wrapped handle comeback to avoid rope ring (kink) phenomenon; solution volumes If you encounter kinks, they should immediately stop, try to eliminate before proceeding. Kink phenomenon, according to the different levels will kink rope breaking force decreased by about 40-60%.  rope  should be slowly rotating disc or scroll slowly unwinding the rope to prevent twisting or loose twist phenomenon. Solution volume; strictly prohibited to use the wrong method in Figure 3 deconvolution to avoid twisting (pull its weight) or loose twist (broken Jin) phenomenon, causing kinks.

没有评论:

发表评论